Project Name | Client | Address | Type of Contract | Date |
---|---|---|---|---|
Najmat Al-Samawah Cement Factory Project (8-inch gas pipe) | Najmat Al-Samawah Company | Iraq - Samawah | Preparation and implementation | 10/10/2021 |
Saman Cement Factory Project (8-knot gas pipe) | Khairat Al-Abar Iraqi Oil Services Company | Iraq - Samawah | Design, preparation and implementation | 9/1/2020 |
Karbala Cement Factory – Strategic dry gas pipeline (24 knots) | Karbala Cement Industry Limited Company | Iraq - Karbala | Design and equip | 1/8/2022 |
E.P.C SOUR GAS PROJECT | Maysan Power Company, Ltd | Iraq - Maysan | Inspection Services | 5/9/2024 |
Ultrasonic Metering Skid – Badoosh Extension | Iraqi Cement State Company | Iraq - Mosul | Supply | 5/4/2024 |
Project Name | Client | Address | Type of Contract | Date |
---|---|---|---|---|
HDD Pipeline Project | Ministry of Oil / Oil Pipeline Company | Iraq - Baghdad | E.P.C & HDD Crossing River | 29/10/2024 |
10/10/2021
9/1/2020
1/8/2022
5/9/2024
5/4/2024
A strategic investment project requiring the extension of a gas pipeline from the strategic line (24 inches) to Najmat Al-Samawah Cement Plant. Scope includes steel pipes, fittings, gas flow meter installation, and full civil works.
Duration: 9 months
Design and implementation of an 8-inch gas pipeline from the strategic line to the main kilns of the plant. Scope includes electronic pressure reducing system, valves, protection equipment, and electrical systems.
Duration: 6 months
Gas pipeline extension from the 10–12 inch strategic line to Karbala Cement Plant. Total pipeline length is approximately 1000 meters.
Duration: 5 months
Installation of a gas dry flow measurement platform. Located in Badoosh Cement Plant as part of expansion works. Executed for the Iraqi Cement State Company.
Duration: 30 days
Major pipeline extension project (18 inches) with measurement skids and fuel oil transfer system. Scope includes 3000 meters HDD crossing, skids installation, civil and electromechanical works, and construction of safety pits and concrete sumps.
Duration: 4 months
Gas acid line installation project using 18-inch pipe. Executed in HALFAYAH, Maysan.
Duration: Ongoing