Our Projects

Discover our key achievements and ongoing work inside Iraq

Completed Projects

Project Name Client Address Type of Contract Date
Najmat Al-Samawah Cement Factory Project (8-inch gas pipe) Najmat Al-Samawah Company Iraq - Samawah Preparation and implementation 10/10/2021
Saman Cement Factory Project (8-knot gas pipe) Khairat Al-Abar Iraqi Oil Services Company Iraq - Samawah Design, preparation and implementation 9/1/2020
Karbala Cement Factory – Strategic dry gas pipeline (24 knots) Karbala Cement Industry Limited Company Iraq - Karbala Design and equip 1/8/2022
E.P.C SOUR GAS PROJECT Maysan Power Company, Ltd Iraq - Maysan Inspection Services 5/9/2024
Ultrasonic Metering Skid – Badoosh Extension Iraqi Cement State Company Iraq - Mosul Supply 5/4/2024

Ongoing Projects

Project Name Client Address Type of Contract Date
HDD Pipeline Project Ministry of Oil / Oil Pipeline Company Iraq - Baghdad E.P.C & HDD Crossing River 29/10/2024

Additional Project Details

Najmat Al-Samawah Project

A strategic investment project requiring the extension of a gas pipeline from the strategic line (24 inches) to Najmat Al-Samawah Cement Plant. Scope includes steel pipes, fittings, gas flow meter installation, and full civil works.

Duration: 9 months

Saman Cement Plant

Design and implementation of an 8-inch gas pipeline from the strategic line to the main kilns of the plant. Scope includes electronic pressure reducing system, valves, protection equipment, and electrical systems.

Duration: 6 months

Karbala Project

Gas pipeline extension from the 10–12 inch strategic line to Karbala Cement Plant. Total pipeline length is approximately 1000 meters.

Duration: 5 months

Badoosh Station

Installation of a gas dry flow measurement platform. Located in Badoosh Cement Plant as part of expansion works. Executed for the Iraqi Cement State Company.

Duration: 30 days

Al-Seniyah Contract

Major pipeline extension project (18 inches) with measurement skids and fuel oil transfer system. Scope includes 3000 meters HDD crossing, skids installation, civil and electromechanical works, and construction of safety pits and concrete sumps.

Duration: 4 months

SOUR GAS TRANSSMISSION FROM BUZARGAN TO HALFAYAH - Maysan

Gas acid line installation project using 18-inch pipe. Executed in HALFAYAH, Maysan.

Duration: Ongoing